  1. The Denver International Airport: The construction of the Denver International Airport in the 1990s was plagued by delays and cost overruns, ultimately costing $4.8 billion, more than $2 billion over budget. The mistakes made during the construction process included poor management, faulty planning, and design errors.

  2. The Boston "Big Dig": The Boston "Big Dig" was a massive highway construction project that was intended to improve traffic flow in the city. However, it ended up costing $22 billion, more than double the original estimate, due to poor management, delays, and cost overruns.

  3. The Freedom Tower: The construction of the Freedom Tower at the World Trade Center site in New York City was plagued by cost overruns and delays. The tower, which was originally estimated to cost $3 billion, ended up costing $3.9 billion, due to design changes, security requirements, and other unexpected expenses.

  4. The San Francisco Bay Bridge: The construction of the San Francisco Bay Bridge was a massive and complex project that was plagued by delays and cost overruns. The bridge was originally estimated to cost $1.3 billion, but ended up costing $6.5 billion, due to design changes, poor management, and other factors.

  5. The Miami International Airport: The construction of the Miami International Airport was plagued by delays and cost overruns, ultimately costing $5.5 billion, more than $2 billion over budget. The mistakes made during the construction process included poor management, faulty planning, and design errors.

  6. The California High-Speed Rail: The California High-Speed Rail was originally supposed to connect Los Angeles to San Francisco with trains reaching speeds of up to 220 mph, however, it turned out to be a massive construction failure. The cost of the project has ballooned from $40 billion to $80 billion and yet the rail-line is not even half-way complete.

  7. The new York city subway: The new York city subway system is one of the most famous subway systems in the world, but it is also one of the most expensive to build and maintain. The subway system was originally supposed to cost around $35 million, but ended up costing $365 million due to delays, cost overruns and mistakes.

  8. The Detroit-Windsor Tunnel: The Detroit-Windsor Tunnel was built in the 1930s as a way to connect Detroit, Michigan with Windsor, Ontario. The project was plagued by delays and cost overruns, ultimately costing $22 million, more than $7 million over budget. The mistakes made during the construction process included poor management, faulty planning, and design errors.

These examples show how real estate construction mistakes can be extremely costly, both financially and in terms of delays and missed opportunities. They are a reminder of how important it is to have proper planning, management and execution in order to avoid costly mistakes.